PROJECTS AND CASE STUDIES

MYER CHADSTONE, MELBOURNE

Projects and Installations, Automation

A pilot program to measure and verify the energy efficiency benefits of variable speed drives have resulted in energy savings of 71% per annum.

JOHN CURTIN SCHOOL, ANU

Professional Services

The installation of PlantPRO has delivered reliable 24/7 operation and ensured stable conditions are maintained for the building's critical research functions.

BRISBANE CLUB TOWER, BRISBANE

Projects and Installations, Automation

An upgraded building management system to the Tridium Niagara 4 platform has ensured ongoing satisfaction and comfort of occupants and visitors.

100 QUEEN ST, MELBOURNE

Automation, Projects and Installations 

Since PlantPRO integration, an average monthly saving of 30 was achieved in the first 12 months.

222 EXHIBITION ST, MELBOURNE

Intelligent Maintenance

A data-driven maintenance program reduced electrical energy consumption by 11.5% and tenant complaints by 68%.

TUGGERANONG OFFICE PARK

Building Services Network

The installation of a BSN has provided a stable, failsafe and resilient network for the day-to-day running of the building.

SHERATON MIRAGE, GOLD COAST

Projects and Installations, Automation

An innovative solution driven by PlantPRO has saved over $250,000 per annum at this iconic Gold Coast resort.

INNOVATION PLACE, SYDNEY

Automation and Controls

After the installation of PlantPRO, the building's energy consumption stabilised with an average improvement of 11%.

1 COLLINS ST, MELBOURNE

Projects and Installations, Automation

an innovative approach to plant optimisation has created a virtual economy cycle for this office tower in Melbourne.

ANU

Professional Services

A project that delivered enhancements to operation, energy efficiency, sustainability, tenant experience and financial optimisation.

KMART, ROWVILLE

Project and Installations

Airmaster carried out a retrofit on one of the existing R22 PAC units, involving the installation and replacement to with R427A.

LONELY PLANET, MELBOURNE

Automation and Controls

This project consisted of a HVAC Controls and Lighting Controls strategy that reduced energy consumption and enhanced tenant comfort.

COOLEMAN COURT, ACT

Automation and Controls

Deployment of PlantPRO has helped to achieve a 12.3% reduction in 2017 for energy consumption compared to 2016.

833 COLLINS STREET, MELBOURNE

Automation and Controls

Since the deployment of PlantPRO, the site seen a 30% energy saving compared to the previous year.

FOREST HILL SHOPPING CENTRE

Automation and Controls

PlantPRO optimised the operation of the central plant and provided advanced measurement and reporting capabilities.

© 2018 Airmaster Australia Pty Ltd

Refrigerant Trading Authorisation AU05364, AU27197 (QLD)

(VIC) REC No:  9954

  • Black Facebook Icon
  • Black Twitter Icon
  • Black LinkedIn Icon